Article
- "From behind, through the chest into the eye"
BY D I E T E R S A L Z M A N N
HESSISCH LICHTENAU. Transporting oversized goods has to
date been at least as difficult as the construction of these
products. Wide roads become narrow and large curv...
mehr...
- "Muscle man" heaves heavy freight onto a ship
Spectacular loading action on the jetty in front of
Grohnde atomic power station / the destination is
Siberia
Hameln/Grohnde (ni.) 240 tonnes are hanging
from the arm-thick steel cables of the hea...
mehr...
- 240 tonnes on 24 axles
240 tonnes, that's the weight of
this component sent on its
journey to St. Petersburg with a
24 axle heavy goods vehicle by Richter
Maschinenfabrik in Hessisch Lichtenau on Monday,
01.10.2007. Ou...
mehr...
- A colossal departure
After more than four hours the pontoon
boat
with the 240 tonne component cast off in
Gimte.
Hessisch Lichtenau / Gimte. The towing machine
chuffing away, the metal ramp squeaking, the colossus i...
mehr...
- A colossus on wheels
Richter Maschinenfabrik AG sends 240 tonne component on
its way – first stop in Gimte
Hessisch Lichtenau. 6000
kilometres is the distance travelled by the heavy goods
transport firm Felbermayer, t...
mehr...
- A historic tour de force
Richter transferred its first cargo from the ship at the
River Weser transfer point.
B Y H E L M U
T K R I S C H M A N N
HANN. MÜNDEN.At 11.37 hrs precisely, the Weser
transfer point's great...
mehr...
- Areva Multibrid M5000
Die Richter Maschinenfabrik hat im Jahr 2002 bereits den
Prototypen des Maschinengehäuse M5000 der von Areva-Wind
entwickelten 5 Megawatt Offshore-Windenergieanlage mechanisch
bearbeitet. Weitere, ...
mehr...
- Arrival in Vyksa - Russia
...
mehr...
- ATC Asphalt-Thermo-Container A. Richter GmbH
When the Asphalt-Thermo-Container was first
introduced on the market in the mid 80's, only a few recognized the
advantages of such a machine right away.
Because of technical improvements and the ne...
mehr...
- BOHNET Heavy Transport - International Forwarding Agency
The first heavy transport that left the works of the company
Richter from Hessisch Lichtenau at the end of September is
associated with a group of a total of six elements, which will soon
be on the...
mehr...
- Carousel lathe
Platzieren Sie hier Ihre eigenen Texte und Bilder. Bearbeiten Sie diesen Text einfach durch einen Doppelklick....
mehr...
- Cement mills/swing arms assembly
Dim. 1,825 x 2,080 x 4,834 mm
Total weight: approx. 38,900 kg...
mehr...
- Certificates
...
mehr...
- Clear to load
Colossal component will cast off at midday
today
GIMTE. Preparations are in full swing for
transport of the first of two 240 tonne components. Ten men of the
heavy transport firm Felbermayr will p...
mehr...
- Contact
Richter Maschinenfabrik AG
Industriestraße 30
37235 Hessisch Lichtenau
Area Kassel
Germany
Phone+49 5602 801-0
Fax+49 5602 801-29
email: info@richter-ag.de...
mehr...
- Control of the work pieces after manufacturing.
...
mehr...
- Download in high quality
Download the Windows Media Video File
size 16 MB
Sources: NDR Niedersachsen, Hessischer
Rundfunk...
mehr...
- Everything one size bigger
Maschinenfabrik Richter builds the most powerful
equipment in the worldin Hessisch
Lichtenau.
BY D I E T E R S A L Z M A N N
HESSISCH LICHTENAU. Large is not large enough
for Axel Richter and hea...
mehr...
- Examples from the forge technique.
...
mehr...
- Federal Administrative Court allows continued construction of the A 44
Kassel/Leipzig (ddp-lth). Almost six years after a
construction stop imposed by the Federal Administrative Court,
construction of the A 44 motorway from Kassel to Eisenach can now
be continued afte...
mehr...
- From A to B. You specify the destination. We organise the transport for you.
The transport of heavy loads and excessive widths requires a high
level of technical expertise to ensure that your workpiece is delivered
undamaged and on time.
We work exclusively with qualifi...
mehr...
- Full-load test stands for 4.5 MW wind-power transmission
...
mehr...
- Gallery
...
mehr...
- Gallery boring machines, boring and milling centre
...
mehr...
- Gallery welding shop
...
mehr...
- Heavy goods transport through North Hesse
A steel colossus starts its travels
250 tonnes – that is roughly the weight of 50 elephants.
That's how much the component of a steel press weights which in
recent days, with spectacular effort, wa...
mehr...
- Heavy goods transport with 32 axles starts on its journey
...
mehr...
- Imprint
Anschrift:
Richter Maschinenfabrik AG
Industriestraße 30
37235 Hessisch Lichtenau
Area Kassel
Germany
Vorsitzender des
Aufsichtsrates:
Prof. Dr. Ing. Walter Döpper
Vorsta...
mehr...
- In the very heart of Germany and Europe.
... from direction of Dortmund (west) A 44 to Kasseler Kreuz, A 7
direction Hanover until exit Kassel-Ost (distance 27 km), direction
Eisenach/Eschwege to Hessisch Lichtenau
... from direction ...
mehr...
- Installation of Skin Pass Mill
Total weight: 540 t, Dimension: ca. 5.200 x 3.400 x 9.700
mm...
mehr...
- KUKA Schweißanlagen GmbH
Delivery of a machine bed, approx. 100 t
weight.
Start the Windows Media Video,
as a download for various bit rates, modem, ISDN and
broadband.
Windows Media Player Homepageand
Download
...
mehr...
- Larger, faster, better. New welding technology allows even larger formats with shorter delivery times.
The market requires it, we react. Long delivery times for large
welding formats prompted us to put even more know-how into the development of a
CNC sensor-controlled submerged-arc welding tracto...
mehr...
- List of machinery
...
mehr...
- Loading & transport of an advanced drilling head after production
...
mehr...
- Machining
During machining, your designs are finished
to
perfection - whatever the size.
Richter's concept is conceivably simple: give us a
challenge, and we will provide you with a tailor-made solution. I...
mehr...
- Map location of the Richter Maschinenfabrik AG
Größere Kartenansicht...
mehr...
- More information on the subject.
...
mehr...
- More information on the subject.
...
mehr...
- More information on the subject.
...
mehr...
- More on this issue
...
mehr...
- More sides to this topic.
...
mehr...
- Not afraid, not even of the biggest
Werra-Rundschau: Mr Richter, do you get used to
always only building the biggest there is in the world?
AXEL RICHTER: Well, we are not at all afraid of
superlatives. Nevertheless, it is of course e...
mehr...
- ø 6 m carousel double column machine
...
mehr...
- On route from Hessisch Lichtenau to Belgium
On 08.04.2008, a supply unit for a wind power gearbox
test rig with a testing output of
17MW for a Belgian customer was loaded as a
heavy goods transport. In the night of 09.04.2008, the
transport...
mehr...
- Other reports
www.extratip.de
www.mb-media.de
www.hna.de
...
mehr...
- Other reports
Extension
of the production area
On account of the continuing high demand we have decided to expand
our production facilities. The useful floor space will be enlarged
from 15,000 m² to 17.000 m...
mehr...
- Other reports
...
mehr...
- Overview
...
mehr...
- Overview
...
mehr...
- Overview
...
mehr...
- Overview
...
mehr...
- Pdf documents of the certificates
DIN EN ISO 9001:2000 (File size
0,2 MB)
DIN EN ISO 3834-2
(File size 0,3 MB)
DIN 18800 Teil 7 (File size 0,4
MB)
...
mehr...
- Picture gallery
...
mehr...
- Picture gallery
...
mehr...
- Picture gallery
...
mehr...
- Picture gallery for the repairs performance
...
mehr...
- Pictures of projects from the area assembly
...
mehr...
- Place plan Hessisch Lichtenau
Größe 0,1 MB...
mehr...
- Port for Richter's giant parts
Heavy goods transports will soon be loaded onto ships at
the River Weser transfer point.
By Helmut Krischmann
HANN. MÜNDEN. New times are dawning for the River Weser transfer
point. Richter Maschi...
mehr...
- Portal milling machine
...
mehr...
- Precision work for the Transrapid
When the Transrapid flits through China, Richter Maschinenfabrik
has contributed quite a lot to make it possible: The points,
weighing many tonnes, are made by it in Hessisch Lichtenau.
Hessisch Li...
mehr...
- Presentation video on the occasion of the Hessentag ("Hesse Days") 2006
...
mehr...
- Press response to: Richter Maschinenfabrik AG sends 240 tonne component on its way
...
mehr...
- Quality you can rely on
We are able to deliver quality down to the last detail, and we can
prove it - our competitive advantage is underlined not only by our outstanding
processing capabilities but also by our internat...
mehr...
- Renaissance of inland navigation?
Regular transport of good through the Oberweser
again – deepening not planned yet.
From Frank Thonicke
KASSEL. At present, there are still 140 million cubic
meters of water in the Edersee, which ...
mehr...
- Richter AG’s line of business
File
size6.8 MB
...
mehr...
- Richter delivers components for a pipeline pipe press to Russia through to the Urals.
Once again our factory in Hessisch Lichtenau has accepted
a special challenge. Having already successfully taken the first
large step towards the real "heavyweights" in
style in 2005 with the top a...
mehr...
- Richter Flash presentation
...
mehr...
- Richter liefert Bauteile für eine Pipeline Rohrpresse nach Russland bis zum Ural
Lesen Sie
hier den vollständigen Bericht....
mehr...
- Richter Maschinenfabrik AG on the Way to Becoming a System Supplier
The range of products and services offered by
Richter Maschinenfabrik AG of Hessisch Lichtenau has so far
involved manufacturing and machining large welded structures
weighing up to 250 tonnes. Axe...
mehr...
- Rotor hub - We treat wind power plants up to 5 MW.
...
mehr...
- Route planner
...
mehr...
- State-of-the-art welding requires optimum documentation.
Richter is the natural choice....
mehr...
- Steel colossus on its travels
Richter sent heavy goods vehicle on its way to
Russia
Hessisch Lichtenau. The machinery module which left the
mechanical engineering company Richter's premises in Lichtenau on a
special vehicl...
mehr...
- Steel colossuses for a 10,000 t pipeline pipe moulding press start on their travels
The first of 6 heavy goods transports (bottom cross members)
with 188 t started on its travels on 29.09.05. 6 machine modules
for a 10000 t open die pipe press for making pipeline pipes
with diamet...
mehr...
- Steel tubbings for tunnel project Russia
As in other cities throughout the world, in
Moscow road traffic is constantly on the increase.
Consequently, two tunnel tubes are to be constructed for the 3rd motorway ring
using trenchless t...
mehr...
- Stress-relief annealing at its best - for any size!
We are committed to excellence - at all times. That is why our
annealing department is equipped with state-of-the-art technology. Using a 580 -
640°C annealing furnace that is suitable for every...
mehr...
- Summary of opening of the River Weser handling point
...
mehr...
- Super-fine machining - a new dimension
Since the beginning of this year, Richter
Maschinenfabrik AG has been machining beds for the "Jumbo" of the
machine series, for one of the most noteworthy milling machine
manufacturers in Germany. ...
mehr...
- Technical data
Basic machine:
Working space and travel max. machining
diameter 8500 mm
max. machining height 6000 mm
Faceplate diameter 6000 mm
Passage width between columns 8300 mm
Horizontal support adju...
mehr...
- The heavyweights
Special order: Richter AG welds giant press
parts for Petersburg
Hessisch Lichtenau · The large job doesn't fit
through the gate. The mechanical engineering company Richter AG has
made it wider an...
mehr...
- The River Weser transfer point is radiant
Late on Tuesday, in the night before the re-opening (see report
below), Kassel's light artist Oliver Bienkowski (26) immersed the
freight ship Paloma in brilliant blue light and also shot white
bun...
mehr...
- The technical highlights in overview:
The technical highlights in
overview:
Working area and travel paths
Max. processing diameter 8500
mm
Max. processing height 6000
mm
Faceplate diameter 6000
mm
Electrical e...
mehr...
- The world's largest wind turbine
The largest wind turbine in the world was put into
service on 02.02.2005, started by Federal Minister of the
Environment Jürgen Trittin, and Richter Maschinenfabrik
AG is involved in this technolog...
mehr...
- Transport on rivers and canals is booming
Relief for motorways – the Oberweser will not be
enlarged after all
From Frank Thonicke
KASSEL. With gridlock looming ahead, with
more and more trucks on the German roads, rivers and canals could
...
mehr...
- Transrapid points for China provided by steel constructor
Transport: Magnetic levitation train places the
highest demands on manufacturing precision
On the world's first commercial transrapid route
sections in Shanghai, the test of the magnetic levitation...
mehr...
- Transrapid points for the track in China, Shanghai
From Pudong airport to Lujiazui.
An 80 m long point is primarily used to change tracks in
stations and can be traversed at 100 km/h. To change track at a higher speed
(200 km/h), a 150 m long e...
mehr...
- Two cranes, two ships, three pieces
The second loading at the Weser transhipment point went like
clockwork. Richter is happy with the conditions
From Helmut Krischmann
HANN-MÜNDEN. "It’s going well." Crane operator, Eugen Sdzuj, is
...
mehr...
- Übersicht
...
mehr...
- Various parts for a ring rolling mill.
...
mehr...
- Via Rüssel to Hanau
By Claas Michaelis
Kassel / Hessisch Lichtenau. The police
completely blocked the A7 and A49 motorways several times during
Tuesday night. A heavy goods transport had started from Hessisch
Lichten...
mehr...
- Video of delivery of a machine bed, approx. 100 t weight.
...
mehr...
- Welcome to Richter Maschinenfabrik AG
We are an independent
German private undertaking with a broad manufacturing
know-how in the field of large-size machine and plant
components.
Our enterprise was founded in
1945 and since then has...
mehr...
- Welding
Welding your ideas into workable solutions. Up to 250
tons.
Our welding shop performs astonishing feats of engineering.
Machine bodies with a unit weight of up to250t fabricated by
qualified ...
mehr...
- What belongs together is joined together. We assemble up to the test run stage.
Perfection is the top priority in the machinery
assembly department. We perform all tasks with state-of-the-art
processes, and we employ highly qualified specialists - 24
hours a day in three shift...